• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Mining Dump Trucks
  • BHP and Rio Tinto Complete First Megawatt Charging Test for Cat 793 XE
    EV/Hydrogen Mining Trucks
    BHP and Rio Tinto Complete First Megawatt Charging Test for Cat 793 XE
    BHP and Rio Tinto complete the first megawatt charging test for Cat 793 XE. Discover what charging above 1 MW could mean for electric mining trucks and future fleet deployment.
    Oct 29, 2026
  • Battery-Electric Mining Trucks: Matching Payload, Range, and Charging to Duty Cycles
    EV/Hydrogen Mining Trucks
    Battery-Electric Mining Trucks: Matching Payload, Range, and Charging to Duty Cycles
    Evaluate battery mining transport equipment with confidence. Discover how to match payload, range, and charging to haul cycles, reduce downtime, and meet production targets.
    Oct 27, 2026
  • China’s Driverless Mining Truck Demand Surges as Shipments Rise Nearly 100-Fold in Six Years
    EV/Hydrogen Mining Trucks
    China’s Driverless Mining Truck Demand Surges as Shipments Rise Nearly 100-Fold in Six Years
    China’s driverless mining truck demand surges as system shipments rise nearly 100-fold. Explore procurement priorities, delivery readiness and export compliance considerations.
    Oct 27, 2026
  • CCTV Reports Autonomous Mining Truck Expansion; 2026 China Shipments May Top 10,000
    Rigid Haul Trucks
    CCTV Reports Autonomous Mining Truck Expansion; 2026 China Shipments May Top 10,000
    Autonomous mining trucks in China could top 10,000 shipments in 2026, according to forecasts cited by CCTV. Explore the technology and challenges shaping large-scale deployment.
    Oct 25, 2026
  • Fortescue Uses KUKA Robots to Handle 6 MW Mining Truck Charging Cables
    EV/Hydrogen Mining Trucks
    Fortescue Uses KUKA Robots to Handle 6 MW Mining Truck Charging Cables
    Fortescue uses KUKA robots to handle 6 MW mining truck charging cables. Explore how robotic handling supports electric haul trucks and what buyers should assess before procurement.
    Oct 23, 2026
  • Autonomous Mine Haul Trucks: Is Your Open-Pit Mine Ready for Deployment?
    Rigid Haul Trucks
    Autonomous Mine Haul Trucks: Is Your Open-Pit Mine Ready for Deployment?
    Autonomous Mine Haul Trucks: Is your open-pit mine ready? Explore safety, infrastructure, pilot testing, and cost criteria to reduce deployment risk and invest with confidence.
    Oct 22, 2026
  • How payload variation affects fuel use for dump trucks in mines
    Rigid Haul Trucks
    How payload variation affects fuel use for dump trucks in mines
    Discover how payload variation affects fuel use for dump trucks in mines, with practical insights to improve haul efficiency, safety, and cost control.
    Oct 16, 2026
  • When an open-pit mining truck manufacturer should offer site trials
    Rigid Haul Trucks
    When an open-pit mining truck manufacturer should offer site trials
    Open-pit mining truck manufacturer site trials help mines validate payload, energy, safety, and fleet performance before making high-stakes procurement decisions.
    Oct 15, 2026
  • What to verify before selecting a mining haulage truck manufacturer
    Rigid Haul Trucks
    What to verify before selecting a mining haulage truck manufacturer
    Choose a mining haulage truck manufacturer with confidence. Verify duty-cycle fit, reliability, safety systems, service support, and lifecycle costs before investing.
    Oct 13, 2026
  • <Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • ...
  • 15
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • Hampton Roads TBM Cutterhead Lowered into Łódź Rail Tunnel Shaft
    Hampton Roads TBM Cutterhead Lowered into Łódź Rail Tunnel Shaft
    Nov 08, 2026
    TBM Engineering Expert
  • Choosing a Mining Drilling Jumbo: Face Size, Boom Reach and Ground Conditions
    Choosing a Mining Drilling Jumbo: Face Size, Boom Reach and Ground Conditions
    Nov 08, 2026
    Rock Drilling Analyst
  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

