• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Pipe Jacking Machines > Micro-tunnelling
  • Choosing a Microtunnelling Systems Supplier: Support and Delivery Checks
    Micro-tunnelling
    Choosing a Microtunnelling Systems Supplier: Support and Delivery Checks
    Choosing a microtunnelling systems supplier? Compare delivery schedules, equipment scope and support to reduce downtime risk and make a confident decision.
    Nov 01, 2026
  • Microtunneling Pipe Installation: Planning Shafts and Managing Jacking Loads
    Micro-tunnelling
    Microtunneling Pipe Installation: Planning Shafts and Managing Jacking Loads
    Microtunneling pipe installation starts with smarter shaft planning and jacking-load control. Discover practical strategies to reduce risks, manage thrust, and keep your drive on track.
    Oct 28, 2026
  • How Does Trenchless Technology Minimize Surface Disruption in Cities?
    Micro-tunnelling
    How Does Trenchless Technology Minimize Surface Disruption in Cities?
    How does trenchless technology minimize surface disruption in cities? Explore how pipe jacking, microtunnelling, and smart planning protect traffic, utilities, and public spaces.
    Oct 10, 2026
  • How to Evaluate a Pipe Jacking Machine in Malaysia for Urban Utility Projects
    Micro-tunnelling
    How to Evaluate a Pipe Jacking Machine in Malaysia for Urban Utility Projects
    Pipe Jacking Machine Malaysia guide for urban utility projects: learn how to assess geology fit, settlement control, support, and cost risk for smarter project decisions.
    Aug 09, 2026
  • When Is Trenchless Tunnelling the Right Choice for Pipeline Crossings?
    Micro-tunnelling
    When Is Trenchless Tunnelling the Right Choice for Pipeline Crossings?
    Trenchless tunnelling for pipeline crossings makes sense when surface disruption, stakeholder risk, and schedule pressure outweigh open-cut savings. Learn the key decision factors before you commit.
    Jul 31, 2026
  • Brazil Raises Micro-tunnelling Import Duty, Exempts Green-Certified Units
    Micro-tunnelling
    Brazil Raises Micro-tunnelling Import Duty, Exempts Green-Certified Units
    Brazil micro-tunnelling import duty rises to 16.5% from Aug 1, 2026, while green-certified units gain zero tariff. See how ANP’s rule changes sourcing, bids, and project costs.
    Jul 13, 2026
  • Microtunneling Contractors: What to Compare Before Bidding a Utility Crossing Project
    Micro-tunnelling
    Microtunneling Contractors: What to Compare Before Bidding a Utility Crossing Project
    Microtunneling contractors should be compared on technical fit, risk control, schedule certainty, safety, and lifecycle value—not price alone. Learn what to review before bidding.
    Jul 12, 2026
  • Shanghai Port Rates Jump 23% as Micro-tunnelling Lead Times Stretch
    Micro-tunnelling
    Shanghai Port Rates Jump 23% as Micro-tunnelling Lead Times Stretch
    Shanghai Port Rates Jump 23% as micro-tunnelling lead times stretch to 12–14 weeks. Learn how rising freight costs, export delays, and alternative logistics plans could impact procurement and project delivery.
    Jul 12, 2026
  • Peru Launches 2026 Copper Mine Phase II Tender
    Micro-tunnelling
    Peru Launches 2026 Copper Mine Phase II Tender
    Peru Launches 2026 Copper Mine Phase II Tender with a US$210M budget, strict CE and ISO 50001 rules, and strong demand for micro-tunnelling equipment—see who can qualify and win.
    Jul 11, 2026
  • <Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • Hampton Roads TBM Cutterhead Lowered into Łódź Rail Tunnel Shaft
    Hampton Roads TBM Cutterhead Lowered into Łódź Rail Tunnel Shaft
    Nov 08, 2026
    TBM Engineering Expert
  • Choosing a Mining Drilling Jumbo: Face Size, Boom Reach and Ground Conditions
    Choosing a Mining Drilling Jumbo: Face Size, Boom Reach and Ground Conditions
    Nov 08, 2026
    Rock Drilling Analyst
  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

