• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Mining Dump Trucks > EV/Hydrogen Mining Trucks
  • BHP and Rio Tinto Complete First Megawatt Charging Test for Cat 793 XE
    EV/Hydrogen Mining Trucks
    BHP and Rio Tinto Complete First Megawatt Charging Test for Cat 793 XE
    BHP and Rio Tinto complete the first megawatt charging test for Cat 793 XE. Discover what charging above 1 MW could mean for electric mining trucks and future fleet deployment.
    Oct 29, 2026
  • Battery-Electric Mining Trucks: Matching Payload, Range, and Charging to Duty Cycles
    EV/Hydrogen Mining Trucks
    Battery-Electric Mining Trucks: Matching Payload, Range, and Charging to Duty Cycles
    Evaluate battery mining transport equipment with confidence. Discover how to match payload, range, and charging to haul cycles, reduce downtime, and meet production targets.
    Oct 27, 2026
  • China’s Driverless Mining Truck Demand Surges as Shipments Rise Nearly 100-Fold in Six Years
    EV/Hydrogen Mining Trucks
    China’s Driverless Mining Truck Demand Surges as Shipments Rise Nearly 100-Fold in Six Years
    China’s driverless mining truck demand surges as system shipments rise nearly 100-fold. Explore procurement priorities, delivery readiness and export compliance considerations.
    Oct 27, 2026
  • Fortescue Uses KUKA Robots to Handle 6 MW Mining Truck Charging Cables
    EV/Hydrogen Mining Trucks
    Fortescue Uses KUKA Robots to Handle 6 MW Mining Truck Charging Cables
    Fortescue uses KUKA robots to handle 6 MW mining truck charging cables. Explore how robotic handling supports electric haul trucks and what buyers should assess before procurement.
    Oct 23, 2026
  • Mining Decarbonization: A Practical Roadmap for Cutting Diesel Use and Emissions
    EV/Hydrogen Mining Trucks
    Mining Decarbonization: A Practical Roadmap for Cutting Diesel Use and Emissions
    Mining Decarbonization roadmap: cut diesel use and emissions with practical fleet electrification, power planning, ventilation optimization, and measurable operational improvements.
    Oct 11, 2026
  • Are Hydrogen Fuel Cell Haul Trucks Viable for Long-Haul Open-Pit Mining?
    EV/Hydrogen Mining Trucks
    Are Hydrogen Fuel Cell Haul Trucks Viable for Long-Haul Open-Pit Mining?
    Hydrogen fuel cell haul trucks can transform long-haul open-pit mining. Explore viability, refuelling, costs, and key factors for reliable low-emission operations.
    Oct 03, 2026
  • What Is the Cost per Ton-Kilometer for Electric vs. Diesel Mine Trucks?
    EV/Hydrogen Mining Trucks
    What Is the Cost per Ton-Kilometer for Electric vs. Diesel Mine Trucks?
    What is the cost per ton-kilometer for electric vs diesel mine trucks? Compare energy, maintenance, payload, charging, and route factors to optimize haulage costs.
    Oct 15, 2026
  • What ESG Compliance Requirements Apply to Mine Equipment Electrification?
    EV/Hydrogen Mining Trucks
    What ESG Compliance Requirements Apply to Mine Equipment Electrification?
    What are the ESG compliance requirements for mine equipment electrification? Explore emissions, battery safety, power sourcing, and lifecycle controls for credible mining ESG claims.
    Oct 09, 2026
  • What is the maximum payload capacity of commercially deployed battery-electric mining dump trucks in 2026?
    EV/Hydrogen Mining Trucks
    What is the maximum payload capacity of commercially deployed battery-electric mining dump trucks in 2026?
    What are the tonnage limits for current electric mining dump trucks? Discover verified 2026 payload ceilings—290 metric tons—and why physics, not promises, defines real-world capacity.
    Sep 16, 2026
  • <Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • ...
  • 9
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez
  • Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Nov 06, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

