• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Tunnel Boring Machines > Hard Rock TBMs
  • EU Eases Dual CE and UKCA Path for Chinese Tunnel Boring Equipment
    Hard Rock TBMs
    EU Eases Dual CE and UKCA Path for Chinese Tunnel Boring Equipment
    EU eases CE and UKCA certification for Chinese tunnel boring equipment, cutting compliance time and helping importers move faster.
    Aug 17, 2026
  • China-UAE Direct Sea Route Cuts TBM and Large Tunneling Equipment Lead Times
    Hard Rock TBMs
    China-UAE Direct Sea Route Cuts TBM and Large Tunneling Equipment Lead Times
    China-UAE direct sea route shortens TBM and large tunneling equipment lead times by 12–15 days, improving delivery predictability for major infrastructure projects. Read the full impact.
    Aug 16, 2026
  • China to Roll Out Nationwide Local and Foreign Currency Cash Pools for Multinationals on Sept. 14
    Hard Rock TBMs
    China to Roll Out Nationwide Local and Foreign Currency Cash Pools for Multinationals on Sept. 14
    China will roll out nationwide local and foreign currency cash pools for multinationals on Sept. 14, streamlining cross-border treasury management and boosting liquidity efficiency.
    Aug 15, 2026
  • China Customs Tightens TBM Export Checks from Aug. 16
    Hard Rock TBMs
    China Customs Tightens TBM Export Checks from Aug. 16
    China Customs tightens TBM export checks from Aug. 16, 2026. Learn how new mandatory inspections may affect tunnelling equipment shipments, compliance, and delivery plans.
    Aug 14, 2026
  • China TBM Lead Times Fall to 8 Months as Overseas Buying Window Opens
    Hard Rock TBMs
    China TBM Lead Times Fall to 8 Months as Overseas Buying Window Opens
    China TBM lead times fall to 8 months, opening a faster overseas buying window. See how shorter delivery cycles can improve tender response, sourcing plans, and project execution.
    Aug 13, 2026
  • EN 15085-2:2026 Becomes Mandatory for TBM Welded Structures
    Hard Rock TBMs
    EN 15085-2:2026 Becomes Mandatory for TBM Welded Structures
    EN 15085-2:2026 becomes mandatory for TBM welded structures exported to the EU. Learn how CL1 certification, TOFD/PAUT, and traceability rules impact customs clearance and delivery.
    Aug 02, 2026
  • EU Tightens TBM Welding Rules Under EN 15085-2:2026
    Hard Rock TBMs
    EU Tightens TBM Welding Rules Under EN 15085-2:2026
    EU Tightens TBM Welding Rules Under EN 15085-2:2026: discover how the new EU standard reshapes TBM certification, ISO 3834-2 compliance, and export approval before Nov. 1, 2026.
    Aug 01, 2026
  • EU Revises EMC Rules for Underground Equipment
    Hard Rock TBMs
    EU Revises EMC Rules for Underground Equipment
    EU Revises EMC Rules for Underground Equipment: learn how Regulation (EU) 2026/1289 impacts CE compliance, certification timing, and export readiness for mining and tunnelling machines.
    Jul 17, 2026
  • TBM Technology in China vs Global Standards: What Buyers Should Compare
    Hard Rock TBMs
    TBM Technology in China vs Global Standards: What Buyers Should Compare
    tbm technology in China vs global standards: compare geology fit, automation, energy efficiency, service support, and lifecycle cost to make smarter TBM buying decisions.
    Jul 15, 2026
  • <Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • ...
  • 12
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn
  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

