• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Tunnel Boring Machines > Hard Rock TBMs
  • Codelco global TBM tender tightens delivery window
    Hard Rock TBMs
    Codelco global TBM tender tightens delivery window
    Codelco global TBM tender tightens delivery window with a 9-month deadline, UCS≥250MPa capability and AI wear monitoring—see what it means for manufacturers, exporters and suppliers.
    Jun 18, 2026
  • Codelco Launches Hard-Rock TBM Tender With Sub-10-Month Delivery
    Hard Rock TBMs
    Codelco Launches Hard-Rock TBM Tender With Sub-10-Month Delivery
    Codelco launches a hard-rock TBM tender for El Teniente with a sub-10-month delivery target. Explore what this means for TBM makers, cutter suppliers, and mining procurement teams.
    Jun 17, 2026
  • Indonesia Eases Nickel Quotas, Relief for TBM Parts Supply
    Hard Rock TBMs
    Indonesia Eases Nickel Quotas, Relief for TBM Parts Supply
    Indonesia eases nickel quotas, improving TBM parts supply and alloy steel availability. See how this may shorten lead times and stabilize costs for tunnelling equipment buyers.
    Jun 17, 2026
  • Chinese TBMs Shift the Competitive Rulebook
    Hard Rock TBMs
    Chinese TBMs Shift the Competitive Rulebook
    Chinese TBMs are rewriting TBM competition through scale, innovation, and integrated service. See how procurement, compliance, exports, and lifecycle support may change next.
    Jun 16, 2026
  • Codelco TBM Tender Tightens Delivery and Service Rules
    Hard Rock TBMs
    Codelco TBM Tender Tightens Delivery and Service Rules
    Codelco TBM Tender tightens delivery and service rules, requiring hard rock TBMs, fast commissioning, remote O&M, and cutter monitoring. See what suppliers must prepare now.
    Jun 16, 2026
  • EU EN 45001 Rule Becomes Mandatory for TBM Imports
    Hard Rock TBMs
    EU EN 45001 Rule Becomes Mandatory for TBM Imports
    EU EN 45001 Rule becomes mandatory for TBM imports from July 1, 2026. Learn compliance timelines, customs risks, and how exporters can avoid shipment delays and secure EU market access.
    Jun 16, 2026
  • TBM Backup System Parts Explained: Functions, Wear Points, and Replacement Planning
    Hard Rock TBMs
    TBM Backup System Parts Explained: Functions, Wear Points, and Replacement Planning
    tbm backup system parts explained: learn key functions, common wear points, and smart replacement planning to reduce downtime, improve safety, and keep TBM projects moving.
    Jun 15, 2026
  • How to Choose TBM Automation Systems for Urban Tunneling Projects
    Hard Rock TBMs
    How to Choose TBM Automation Systems for Urban Tunneling Projects
    TBM automation systems for urban tunneling: learn how to compare control stability, guidance accuracy, data integration, and supplier support to improve safety, quality, and project performance.
    Jun 15, 2026
  • Codelco Tender Signals Hard-Rock TBM Shift
    Hard Rock TBMs
    Codelco Tender Signals Hard-Rock TBM Shift
    Codelco tender highlights a hard-rock TBM shift at El Teniente, with 9.2m full-face machines for UCS above 250 MPa. See how this impacts bids, suppliers, delivery, and service planning.
    Jun 15, 2026
  • <Previous
  • 1
  • ...
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • ...
  • 12
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn
  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

