• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Tunnel Boring Machines
  • Codelco Raises TBM Bid Bar With Built-In AI Rock ID
    Hard Rock TBMs
    Codelco Raises TBM Bid Bar With Built-In AI Rock ID
    Codelco raises the TBM bid bar with built-in AI rock ID, ISO/IEC 17025 validation, and MineOS 5.3 compliance. See how this rule change could reshape bidding, procurement, and delivery.
    Jun 29, 2026
  • EU Rule Takes Effect: EN 16890:2026 Required for Shield Exports
    Slurry/EPB Shields
    EU Rule Takes Effect: EN 16890:2026 Required for Shield Exports
    EN 16890:2026 is now mandatory for shield exports to EU projects. Learn how CE marking, Notified Body reports, contracts, and delivery timelines are affected.
    Jun 29, 2026
  • PSA Opens 36-Hour TBM Clearance Lane With CNAS Wear Test Rule
    Cutterheads & Disc Cutters
    PSA Opens 36-Hour TBM Clearance Lane With CNAS Wear Test Rule
    PSA opens a 36-hour TBM clearance lane, but only with a CNAS wear test report meeting ASTM G65 or ISO 15184. Learn what exporters, buyers, and logistics teams must prepare now.
    Jun 28, 2026
  • EU CE Update Brings TBMs Under EN 474-1:2026+A1:2026
    Hard Rock TBMs
    EU CE Update Brings TBMs Under EN 474-1:2026+A1:2026
    EU CE Update Brings TBMs Under EN 474-1:2026+A1:2026. Learn how CE type examination, new safety rules, and TBM compliance changes may impact exports, procurement, and delivery to the EU.
    Jun 28, 2026
  • TBM Disc Cutter Supplier Selection: What to Check Beyond Price and Lead Time
    Cutterheads & Disc Cutters
    TBM Disc Cutter Supplier Selection: What to Check Beyond Price and Lead Time
    TBM disc cutter supplier selection goes beyond price and lead time. Learn how to assess quality, wear performance, service support, and lifecycle value for safer, more efficient tunnelling.
    Jun 28, 2026
  • TBM Components Supplier Checklist: Parts Quality, Lead Times, and Support Compared
    Hard Rock TBMs
    TBM Components Supplier Checklist: Parts Quality, Lead Times, and Support Compared
    tbm components supplier checklist covering parts quality, lead times, and technical support. Compare key risk factors, avoid costly delays, and choose with more confidence.
    Jun 27, 2026
  • Malaysia Launches TBM Fast-Track Clearance, Cuts Customs to 48 Hours
    Slurry/EPB Shields
    Malaysia Launches TBM Fast-Track Clearance, Cuts Customs to 48 Hours
    Malaysia Launches TBM Fast-Track Clearance and cuts customs to 48 hours. Learn how the new pre-registration rule affects TBM exporters, contractors, procurement teams, and logistics planning.
    Jun 27, 2026
  • EU Rule to Require Carbon Footprint Reports for Underground Machinery
    Hard Rock TBMs
    EU Rule to Require Carbon Footprint Reports for Underground Machinery
    EU Rule to Require Carbon Footprint Reports for Underground Machinery: learn how ISO 14067 carbon footprint reporting will affect EU imports, customs clearance, delivery timelines, and exporter compliance.
    Jun 27, 2026
  • TBM Disc Cutter Design Explained: Key Parameters for Rock Type, Wear, and Penetration
    Cutterheads & Disc Cutters
    TBM Disc Cutter Design Explained: Key Parameters for Rock Type, Wear, and Penetration
    TBM disc cutter design explained in a practical guide covering rock type, wear, spacing, load, and penetration—learn how smarter cutter choices reduce downtime and improve tunnelling performance.
    Jun 26, 2026
  • <Previous
  • 1
  • ...
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • ...
  • 21
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn
  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

