• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Tunnel Boring Machines
  • Mumbai Port Receives Two Guangzhou-Built TBMs
    Hard Rock TBMs
    Mumbai Port Receives Two Guangzhou-Built TBMs
    Mumbai Port receives two Guangzhou-built TBMs for India’s first high-speed rail undersea section, highlighting TBM export reliability, compliance, shipping, and commissioning readiness.
    Jun 22, 2026
  • China-Made Mining TBM Starts Work in Zambia
    Hard Rock TBMs
    China-Made Mining TBM Starts Work in Zambia
    China-made mining TBM starts work in Zambia, highlighting CE certification, African mining safety approval, export readiness, and localized service strengths. Explore what it means for buyers and suppliers.
    Jun 21, 2026
  • Soft Ground TBM Excavation: When EPB or Slurry Shields Are the Better Choice
    Slurry/EPB Shields
    Soft Ground TBM Excavation: When EPB or Slurry Shields Are the Better Choice
    Soft ground TBM excavation explained: discover when EPB or slurry shields are the better choice for safer tunnelling, tighter settlement control, and smarter project decisions.
    Jun 20, 2026
  • Bay Area Bridge-Tunnel Expo Debuts TBM Cloud Platform
    Hard Rock TBMs
    Bay Area Bridge-Tunnel Expo Debuts TBM Cloud Platform
    Bay Area Bridge-Tunnel Expo debuts a TBM cloud platform with multilingual remote operation and maintenance. Explore how this launch could reshape export delivery, procurement, and after-sales service.
    Jun 19, 2026
  • TBM Excavation vs Drill and Blast: Which Method Fits Hard Rock Tunnels?
    Hard Rock TBMs
    TBM Excavation vs Drill and Blast: Which Method Fits Hard Rock Tunnels?
    TBM Excavation vs drill and blast in hard rock tunnels: compare geology fit, cost, speed, ventilation, and risk to choose the most efficient method for your project.
    Jun 18, 2026
  • Codelco global TBM tender tightens delivery window
    Hard Rock TBMs
    Codelco global TBM tender tightens delivery window
    Codelco global TBM tender tightens delivery window with a 9-month deadline, UCS≥250MPa capability and AI wear monitoring—see what it means for manufacturers, exporters and suppliers.
    Jun 18, 2026
  • Codelco Launches Hard-Rock TBM Tender With Sub-10-Month Delivery
    Hard Rock TBMs
    Codelco Launches Hard-Rock TBM Tender With Sub-10-Month Delivery
    Codelco launches a hard-rock TBM tender for El Teniente with a sub-10-month delivery target. Explore what this means for TBM makers, cutter suppliers, and mining procurement teams.
    Jun 17, 2026
  • Indonesia Eases Nickel Quotas, Relief for TBM Parts Supply
    Hard Rock TBMs
    Indonesia Eases Nickel Quotas, Relief for TBM Parts Supply
    Indonesia eases nickel quotas, improving TBM parts supply and alloy steel availability. See how this may shorten lead times and stabilize costs for tunnelling equipment buyers.
    Jun 17, 2026
  • EPB Shield Price Breakdown: What Drives Cost in Urban Tunneling Projects?
    Slurry/EPB Shields
    EPB Shield Price Breakdown: What Drives Cost in Urban Tunneling Projects?
    EPB shield price explained: discover what drives costs in urban tunneling projects, from geology and automation to hidden lifecycle expenses, so you can compare offers smarter.
    Jun 16, 2026
  • <Previous
  • 1
  • ...
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • ...
  • 21
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • Mega Tunnel Contractors: How to Evaluate Experience and Project Risks
    Mega Tunnel Contractors: How to Evaluate Experience and Project Risks
    Nov 23, 2026
    Ms. Elena Rodriguez
  • Hudson Tunnel Project’s Second TBM Begins Excavating South Tunnel
    Hudson Tunnel Project’s Second TBM Begins Excavating South Tunnel
    Nov 22, 2026
    TBM Engineering Expert
  • How Bolting Jumbo Automation Works in Underground Rock Support
    How Bolting Jumbo Automation Works in Underground Rock Support
    Nov 22, 2026
    Rock Drilling Analyst

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

