• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Tunnel Boring Machines
  • EU REACH Adds TBM Hydraulic Oil SVHC Declaration Rule
    Slurry/EPB Shields
    EU REACH Adds TBM Hydraulic Oil SVHC Declaration Rule
    EU REACH adds a new TBM hydraulic oil SVHC declaration rule. Learn how EN 14040:2025 impacts TBM exports, customs clearance, supplier documents, and EU project compliance.
    Jul 06, 2026
  • Tunnel Excavation Systems Explained: Types, Ground Conditions, and Selection Criteria
    Hard Rock TBMs
    Tunnel Excavation Systems Explained: Types, Ground Conditions, and Selection Criteria
    Tunnel Excavation Systems explained clearly: compare TBMs, roadheaders, drill-and-blast, and microtunnelling by ground conditions, cost, speed, and risk.
    Jul 05, 2026
  • Changsha Smart Line Cuts Disc Cutter Lead Time to 6 Weeks
    Cutterheads & Disc Cutters
    Changsha Smart Line Cuts Disc Cutter Lead Time to 6 Weeks
    Disc cutter lead time drops to 6 weeks as Changsha’s smart line enters mass production. See how AI-driven manufacturing could reshape hard-rock procurement and supply planning.
    Jul 05, 2026
  • EU Sets Methane Tolerance Certification Rule for Slurry/EPB Shields
    Slurry/EPB Shields
    EU Sets Methane Tolerance Certification Rule for Slurry/EPB Shields
    EU Sets Methane Tolerance Certification Rule for Slurry/EPB Shields: learn the new EU compliance threshold, ATEX plus methane certificate requirements, and key customs, export, and delivery risks from July 2026.
    Jul 05, 2026
  • Slurry Tunnel Boring Machines vs EPB Shields: How to Choose for Mixed Ground
    Slurry/EPB Shields
    Slurry Tunnel Boring Machines vs EPB Shields: How to Choose for Mixed Ground
    slurry Tunnel Boring Machines vs EPB shields: learn how to choose for mixed ground, groundwater, settlement control, spoil handling, and lower project risk.
    Jul 04, 2026
  • EU Methane Certification Rule Takes Effect for Slurry/EPB Shields
    Slurry/EPB Shields
    EU Methane Certification Rule Takes Effect for Slurry/EPB Shields
    EU Methane Certification Rule now mandates EN 16729:2026 compliance for Slurry/EPB Shields. Learn how certification delays, customs risks, and Q3 shipment pressure may impact EU market access.
    Jul 04, 2026
  • TBM Cutter Tools China: How to Compare Materials, Lead Time, and OEM Capability
    Cutterheads & Disc Cutters
    TBM Cutter Tools China: How to Compare Materials, Lead Time, and OEM Capability
    TBM cutter tools China: compare material quality, lead time, and real OEM capability before price. Learn how to reduce downtime, control risk, and choose a reliable supplier.
    Jul 03, 2026
  • Tunnel Boring Machine Components for Slurry Shields: Functions, Wear Parts, and Selection
    Slurry/EPB Shields
    Tunnel Boring Machine Components for Slurry Shields: Functions, Wear Parts, and Selection
    Tunnel Boring Machine Components for slurry shields explained: functions, key wear parts, failure signals, and smart selection tips to improve uptime, reduce risk, and support better project decisions.
    Jul 03, 2026
  • EU Rule Takes Effect for Slurry/EPB Shields
    Slurry/EPB Shields
    EU Rule Takes Effect for Slurry/EPB Shields
    EU Rule Takes Effect for Slurry/EPB Shields: learn how EN 16729:2026 methane-tolerance certification now affects CE marking, EU imports, port acceptance, and shipment planning.
    Jul 03, 2026
  • <Previous
  • 1
  • ...
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • ...
  • 21
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn
  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

