• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Drilling Jumbos
  • How Drilling Jumbos Automation Improves Advance Rates and Operator Safety
    Computerized Jumbos
    How Drilling Jumbos Automation Improves Advance Rates and Operator Safety
    Drilling Jumbos automation boosts advance rates, improves drilling accuracy, and reduces operator exposure underground. See where full or partial automation delivers the best ROI.
    Jun 17, 2026
  • Hydraulic Rock Drill Percussion Frequency Explained: How It Affects Penetration and Tool Wear
    Hydraulic Rock Drills
    Hydraulic Rock Drill Percussion Frequency Explained: How It Affects Penetration and Tool Wear
    Hydraulic rock drill percussion frequency explained: discover how it impacts penetration, tool wear, hole quality, and drilling cost for smarter equipment selection.
    Jun 16, 2026
  • Drilling Jumbos for Blasting: Key Specifications for Safer Face Drilling
    Computerized Jumbos
    Drilling Jumbos for Blasting: Key Specifications for Safer Face Drilling
    Drilling Jumbos for blasting: explore the key specifications that improve hole accuracy, dust control, and operator safety for more reliable underground face drilling.
    Jun 15, 2026
  • Common Drift Development Mining Delays and How to Improve Advance Rate Underground
    Bolting & Drilling
    Common Drift Development Mining Delays and How to Improve Advance Rate Underground
    Drift development mining delays often come from drilling errors, ventilation gaps, downtime, and weak haulage flow. Learn practical ways to raise advance rate underground faster and safer.
    Jun 13, 2026
  • Hydraulic Rock Drills
    AS/NZS 4775:2026 Tightens Vibration Limits for Rock Drills
    AS/NZS 4775:2026 tightens vibration limits for Hydraulic Rock Drills, cutting the 8-hour threshold to 1.2 m/s². See key compliance, import, and procurement impacts now.
    Jun 09, 2026
  • AS/NZS 4775:2026 Tightens Vibration Test Rules
    Hydraulic Rock Drills
    AS/NZS 4775:2026 Tightens Vibration Test Rules
    AS/NZS 4775:2026 tightens vibration test rules for Hydraulic Rock Drills, lowering limits and requiring NATA lab reports. Learn how this impacts Australia market access, compliance, and procurement readiness.
    Jun 08, 2026
  • Underground Drilling Equipment Types Explained: Jumbos, Bolters, and Rock Drills
    Bolting & Drilling
    Underground Drilling Equipment Types Explained: Jumbos, Bolters, and Rock Drills
    Underground Drilling Equipment explained: compare jumbos, bolters, and rock drills to improve tunnelling accuracy, safety, automation, and project efficiency.
    Jun 07, 2026
  • How do drilling jumbos for hard rock cut cycle time?
    Computerized Jumbos
    How do drilling jumbos for hard rock cut cycle time?
    Drilling Jumbos for hard rock cut cycle time through faster setup, precise hole drilling, and smoother face coordination. Learn what features boost output, safety, and shift performance.
    May 28, 2026
  • EU Proposes Ban on AI-Generated Deepfake Porn, Adds AI Ethics Review for Smart Tunneling Exports
    Computerized Jumbos
    EU Proposes Ban on AI-Generated Deepfake Porn, Adds AI Ethics Review for Smart Tunneling Exports
    EU proposes ban on AI-generated deepfake porn & new AI ethics reviews for smart tunneling exports—key compliance insights for industrial exporters.
    May 24, 2026
  • <Previous
  • 1
  • ...
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn
  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

