• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Drilling Jumbos
  • Rock Excavation in Mining: Which Methods Fit Hard Ore, Fractured Rock, and Deep Levels?
    Bolting & Drilling
    Rock Excavation in Mining: Which Methods Fit Hard Ore, Fractured Rock, and Deep Levels?
    Rock excavation in mining explained: compare drill-and-blast, mechanical cutting, and hybrid methods for hard ore, fractured ground, and deep levels to improve safety, cost, and advance rates.
    Jul 14, 2026
  • Rock Bolting Standards Explained: Load Testing, Installation Rules, and Compliance Checks
    Bolting & Drilling
    Rock Bolting Standards Explained: Load Testing, Installation Rules, and Compliance Checks
    Rock bolting standards explained clearly: learn load testing, installation rules, and compliance checks to improve underground safety, reduce risk, and verify support quality with confidence.
    Jul 13, 2026
  • Indonesia Tightens Import Rule for Hydraulic Rock Drills
    Hydraulic Rock Drills
    Indonesia Tightens Import Rule for Hydraulic Rock Drills
    Indonesia tightens import rules for Hydraulic Rock Drills from Sept. 1, 2026. Learn SNI Grade 3 label requirements, 20% tariff risks, and key compliance steps for importers and manufacturers.
    Jul 12, 2026
  • Underground Drilling Jumbo Selection Guide: Boom Reach, Drill Coverage, and Rock Conditions
    Computerized Jumbos
    Underground Drilling Jumbo Selection Guide: Boom Reach, Drill Coverage, and Rock Conditions
    Underground drilling jumbo selection guide covering boom reach, drill coverage, and rock conditions to help improve accuracy, cycle time, and project performance.
    Jul 10, 2026
  • OSHA Sets Trilingual HMI Alert Rule for Rock Drills
    Hydraulic Rock Drills
    OSHA Sets Trilingual HMI Alert Rule for Rock Drills
    OSHA Sets Trilingual HMI Alert Rule for Rock Drills: learn how the new U.S. mining compliance update impacts firmware, localization, ANSI/HFES 100-2026 validation, and market readiness.
    Jul 10, 2026
  • How to Choose Drill and Blast Equipment for Tunnelling by Rock Class and Tunnel Profile
    Computerized Jumbos
    How to Choose Drill and Blast Equipment for Tunnelling by Rock Class and Tunnel Profile
    Drill and Blast Equipment for tunnelling: learn how to match rock class and tunnel profile to the right jumbo setup for safer cycles, better blast results, and higher advance.
    Jul 09, 2026
  • EU Tightens PFAS Limit in Rock Drill Lubricants
    Hydraulic Rock Drills
    EU Tightens PFAS Limit in Rock Drill Lubricants
    EU Tightens PFAS Limit in Rock Drill Lubricants: learn how the new 50 ppb EU rule impacts REACH compliance, lubricant sourcing, testing, and export readiness before 2027.
    Jul 09, 2026
  • PSA Clears First Non-European Bolting & Drilling Platform
    Bolting & Drilling
    PSA Clears First Non-European Bolting & Drilling Platform
    PSA Clears First Non-European Bolting & Drilling Platform: discover how iBoltLink’s 5G+TSN control, AR guidance, and procurement-ready approval could reshape offshore sourcing and digital operations.
    Jul 08, 2026
  • Bolting & Drilling
    PSA Approval Reshapes Automated Bolting Supply Requirements
    PSA Approval Reshapes Automated Bolting Supply Requirements by highlighting ISO 5344:2026 Annex D compliance. Learn how suppliers, exporters, and buyers can protect market access.
    Jul 07, 2026
  • <Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • ...
  • 8
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn
  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

