• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Tunnel Boring Machines
  • China Export Curbs Reach TBM Hydraulic Systems
    Slurry/EPB Shields
    China Export Curbs Reach TBM Hydraulic Systems
    China export curbs are now reaching TBM hydraulic systems, raising risks around firmware updates, technical support, and spare-parts delivery. Learn what buyers and exporters should monitor now.
    Jun 10, 2026
  • Hard Rock TBMs
    EU Rule Adds AI Safety Audits to TBM CE Marking
    EU Rule Adds AI Safety Audits to TBM CE Marking: learn how the new EU compliance step may affect TBM certification, subsystem documentation, and delivery timelines from July 2026.
    Jun 09, 2026
  • EU TBM CE Rule Adds AI Safety Audit Requirement
    Slurry/EPB Shields
    EU TBM CE Rule Adds AI Safety Audit Requirement
    EU TBM CE Rule adds an AI safety audit requirement for machines entering the EU from July 2026. Learn who is affected, EN 50128 SIL2 impacts, and how to prepare for compliance.
    Jun 08, 2026
  • Rock Cutting Mechanics: Key Parameters That Affect Penetration Rate and Tool Wear
    Cutterheads & Disc Cutters
    Rock Cutting Mechanics: Key Parameters That Affect Penetration Rate and Tool Wear
    Rock Cutting Mechanics explained: discover the key factors that drive penetration rate, energy use, and tool wear in TBMs, drilling jumbos, and mixed-ground excavation.
    Jun 08, 2026
  • Deep Tunnel Excavation in Hard Rock: Methods, Risks, and Equipment Selection
    Hard Rock TBMs
    Deep Tunnel Excavation in Hard Rock: Methods, Risks, and Equipment Selection
    Deep Tunnel Excavation in hard rock: compare TBM and drill-and-blast methods, understand depth-driven risks, and choose equipment that improves safety, uptime, and project efficiency.
    Jun 07, 2026
  • SABIC Shutdown Hits TBM and LHD Supply Chains
    Cutterheads & Disc Cutters
    SABIC Shutdown Hits TBM and LHD Supply Chains
    SABIC shutdown hits TBM and LHD supply chains, driving cutter lead-time risks, coating certification delays, and raw-material cost pressure. See what buyers should monitor now.
    Jun 07, 2026
  • EU Reviews JD-Ceconomy Deal Over TBM Supply Risks
    Hard Rock TBMs
    EU Reviews JD-Ceconomy Deal Over TBM Supply Risks
    EU reviews JD-Ceconomy deal over TBM supply risks, affecting procurement channels, compliance routes, and EV Mining Trucks battery management systems. See what it means for suppliers.
    Jun 07, 2026
  • Hard Rock TBMs
    CRCHI Registers 7 Software Copyrights for TBM Export Compliance
    CRCHI Registers 7 Software Copyrights for TBM Export Compliance, signaling stronger EN 50128 SIL2 readiness for Poland and Mexico projects. See why this matters for certification, procurement, and overseas delivery.
    Jun 06, 2026
  • Slurry/EPB Shields
    Xinjiang Agri-Machinery Expo Opens as CRCHI Signs 3 Central Asia Purchase Intentions
    Xinjiang Agri-Machinery Expo opens with CRCHI signing 3 Central Asia purchase intentions, highlighting Belt and Road export opportunities, customized equipment demand, and cross-border procurement trends.
    Jun 06, 2026
  • <Previous
  • 1
  • ...
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • ...
  • 21
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • China's TBM Export Controls Prompt Infrastructure Concerns in India
    China's TBM Export Controls Prompt Infrastructure Concerns in India
    Nov 07, 2026
    Dr. Alistair Vaughn
  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

