• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Pipe Jacking Machines
  • Trenchless Construction Process Explained: Key Steps, Site Limits, and Risk Points
    Slurry Pipe Jacking
    Trenchless Construction Process Explained: Key Steps, Site Limits, and Risk Points
    Trenchless construction process explained clearly: explore key steps, site limits, and major risk points to plan safer, lower-disruption underground projects with confidence.
    Jul 12, 2026
  • Shanghai Port Rates Jump 23% as Micro-tunnelling Lead Times Stretch
    Micro-tunnelling
    Shanghai Port Rates Jump 23% as Micro-tunnelling Lead Times Stretch
    Shanghai Port Rates Jump 23% as micro-tunnelling lead times stretch to 12–14 weeks. Learn how rising freight costs, export delays, and alternative logistics plans could impact procurement and project delivery.
    Jul 12, 2026
  • Trenchless Construction Techniques Explained: Which Method Fits Urban Utility Projects?
    Slurry Pipe Jacking
    Trenchless Construction Techniques Explained: Which Method Fits Urban Utility Projects?
    Trenchless construction techniques explained for urban utility projects. Compare pipe jacking, microtunneling, HDD, and more to choose the safest, most cost-effective method.
    Jul 11, 2026
  • Peru Launches 2026 Copper Mine Phase II Tender
    Micro-tunnelling
    Peru Launches 2026 Copper Mine Phase II Tender
    Peru Launches 2026 Copper Mine Phase II Tender with a US$210M budget, strict CE and ISO 50001 rules, and strong demand for micro-tunnelling equipment—see who can qualify and win.
    Jul 11, 2026
  • Brazil ANP Tightens Import Rules for Slurry Pipe Jacking
    Slurry Pipe Jacking
    Brazil ANP Tightens Import Rules for Slurry Pipe Jacking
    Brazil ANP tightens import rules for Slurry Pipe Jacking used in oil and gas projects. Learn the new coating test, ISO 13678:2026, and customs document requirements.
    Jul 11, 2026
  • Suez Fees Rise 18% as Slurry Pipe Jacking Shipping Jumps
    Slurry Pipe Jacking
    Suez Fees Rise 18% as Slurry Pipe Jacking Shipping Jumps
    Slurry Pipe Jacking shipping costs jump as Suez fees rise 18%, adding $1,200 per container. See how contractors and suppliers can adjust procurement, routes, and delivery plans.
    Jul 10, 2026
  • Codelco Opens Fast-Track Micro-Tunnelling Procurement
    Micro-tunnelling
    Codelco Opens Fast-Track Micro-Tunnelling Procurement
    Codelco opens fast-track Micro-tunnelling procurement, seeking global suppliers for pipe jacking systems. Explore 14-week delivery, ISO 21670:2025 compliance, and South America mining demand.
    Jul 10, 2026
  • PSA Opens Jurong Island Lane for Faster Slurry Pipe Jacking Clearance
    Slurry Pipe Jacking
    PSA Opens Jurong Island Lane for Faster Slurry Pipe Jacking Clearance
    PSA Opens Jurong Island Lane for Faster Slurry Pipe Jacking Clearance with a 48-hour inspection target. See how CE, ISO 9001, and ASEAN Single Window readiness can speed Southeast Asia project deliveries.
    Jul 09, 2026
  • PSA Opens Fast-Track Lane for Micro-tunnelling Equipment
    Micro-tunnelling
    PSA Opens Fast-Track Lane for Micro-tunnelling Equipment
    PSA opens a fast-track lane for micro-tunnelling equipment, cutting inspections to 48 hours with no surcharge. Learn who qualifies, how ISO 11611:2026 applies, and what traders must do next.
    Jul 08, 2026
  • <Previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • ...
  • 12
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez
  • Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Nov 06, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

