• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Pipe Jacking Machines
  • Slurry Pipe Jacking
    Meta Raises AI CapEx to $115B, Boosting TBM Tunnel Demand
    TBM tunnel demand surges as Meta raises AI CapEx to $115B — driving global orders for slurry TBMs, jacking systems & microtunneling rigs.
    May 25, 2026
  • China-Laos Railway Freight Up 37%; Micro-TBM & Rectangular Shield Exports to ASEAN Accelerate
    Rectangular Pipe Jacking
    China-Laos Railway Freight Up 37%; Micro-TBM & Rectangular Shield Exports to ASEAN Accelerate
    China-Laos Railway freight up 37%: micro-TBMs & rectangular shields accelerate ASEAN exports—faster, rail-based clearance for urban tunneling gear.
    May 24, 2026
  • Micro-tunnelling
    Fruit Attraction 2026 Booth Bookings Exceed 90%
    Fruit Attraction 2026 booth bookings exceed 90% — discover how cold-chain equipment, post-harvest tech & global fresh produce trade are evolving ahead of Madrid.
    May 23, 2026
  • Pipe Jacking Machines or microtunnelling for tight sites?
    Micro-tunnelling
    Pipe Jacking Machines or microtunnelling for tight sites?
    Pipe Jacking Machines or microtunnelling for tight sites? Compare accuracy, shaft footprint, ground risk, and urban logistics to choose the safest, most efficient trenchless method.
    May 19, 2026
  • PBOC April Social Financing Up 7.8% YoY; Infrastructure Equipment Export Financing Stabilizes
    Slurry Pipe Jacking
    PBOC April Social Financing Up 7.8% YoY; Infrastructure Equipment Export Financing Stabilizes
    PBOC April social financing up 7.8% YoY—boosting infrastructure equipment export financing for slurry pipe jacking & computerized jumbos in BRI markets.
    May 19, 2026
  • Tunnel Surveying Equipment Errors That Delay Breakthrough
    Micro-tunnelling
    Tunnel Surveying Equipment Errors That Delay Breakthrough
    Tunnel Surveying Equipment errors can delay breakthrough and drive costly rework. Discover the key causes, warning signs, and checks to keep tunnel alignment accurate and projects on schedule.
    May 09, 2026
  • Pipe Jacking Machines for Utility Crossings: What Affects Downtime Most
    Slurry Pipe Jacking
    Pipe Jacking Machines for Utility Crossings: What Affects Downtime Most
    Pipe Jacking Machines downtime in utility crossings is driven by cutter wear, guidance, slurry balance, maintenance, and operator skill. Learn how to reduce stoppages and improve uptime.
    May 09, 2026
  • When Trenchless Engineering Beats Open-Cut Construction on Urban Projects
    Micro-tunnelling
    When Trenchless Engineering Beats Open-Cut Construction on Urban Projects
    Trenchless Engineering often outperforms open-cut in urban projects. Discover when it cuts disruption, lowers risk, protects ESG goals, and delivers stronger long-term value.
    May 09, 2026
  • Pipe Jacking Machines: How to Avoid Alignment Problems on Tight Corridors
    Slurry Pipe Jacking
    Pipe Jacking Machines: How to Avoid Alignment Problems on Tight Corridors
    Pipe Jacking Machines guide for tight urban corridors: learn how to prevent alignment problems with better steering, lubrication, geotechnical control, and real-time monitoring.
    May 09, 2026
  • <Previous
  • 1
  • ...
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez
  • Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Nov 06, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

