• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Pipe Jacking Machines
  • Indonesia Adds ISO 50001 Rule for Pipe Jacking Imports
    Slurry Pipe Jacking
    Indonesia Adds ISO 50001 Rule for Pipe Jacking Imports
    Indonesia’s new ISO 50001 rule for pipe jacking imports may affect customs clearance and SNI approval—see what manufacturers and traders must prepare.
    Jun 03, 2026
  • Trenchless Pipe Installation Equipment: Key Specs for Urban Utility Projects
    Micro-tunnelling
    Trenchless Pipe Installation Equipment: Key Specs for Urban Utility Projects
    Trenchless Pipe Installation equipment specs for urban utility projects—compare jacking force, steering, ground support, monitoring, and costs to reduce risk.
    Jun 03, 2026
  • Indonesia Tightens Slurry Pipe Jacking Imports
    Slurry Pipe Jacking
    Indonesia Tightens Slurry Pipe Jacking Imports
    Indonesia Slurry Pipe Jacking imports now face ISO 50001 certification rules. Learn how the new API-U requirement affects suppliers, contractors, and import planning.
    Jun 02, 2026
  • Trenchless Engineering Methods: Pipe Jacking, Microtunnelling, and TBMs
    Micro-tunnelling
    Trenchless Engineering Methods: Pipe Jacking, Microtunnelling, and TBMs
    Trenchless Engineering guide comparing pipe jacking, microtunnelling, and TBMs to reduce disruption, control ground risk, and improve underground project delivery.
    Jun 02, 2026
  • What Makes Tunnel Surveying Equipment Accurate Underground?
    Micro-tunnelling
    What Makes Tunnel Surveying Equipment Accurate Underground?
    Tunnel Surveying Equipment accuracy depends on sensors, control networks, calibration, and field discipline—learn how to reduce risk and improve underground project control.
    Jun 01, 2026
  • Which Trenchless Pipe Installation methods fit cities?
    Micro-tunnelling
    Which Trenchless Pipe Installation methods fit cities?
    Trenchless Pipe Installation methods for cities: compare pipe jacking, microtunnelling, HDD, auger boring and pipe ramming to cut risk, cost and disruption.
    May 29, 2026
  • When trenchless pipe installation equipment saves money
    Micro-tunnelling
    When trenchless pipe installation equipment saves money
    Trenchless Pipe Installation equipment saves money by reducing excavation, restoration, and traffic disruption. See when it delivers the best ROI for underground projects.
    May 28, 2026
  • Why trenchless technology matters in busy urban projects
    Micro-tunnelling
    Why trenchless technology matters in busy urban projects
    Trenchless Technology for urban construction helps busy city projects cut disruption, reduce risk, and improve delivery. See why it matters for utilities, transport corridors, and dense urban sites.
    May 27, 2026
  • Which trenchless construction methods suit tight city corridors
    Micro-tunnelling
    Which trenchless construction methods suit tight city corridors
    Trenchless Construction Methods for tight city corridors: compare microtunneling, pipe jacking, HDD, and rehab options to reduce risk, protect traffic, and choose the best urban fit.
    May 26, 2026
  • <Previous
  • 1
  • ...
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez
  • Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Nov 06, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

