• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Pipe Jacking Machines
  • Trenchless Construction Methods Explained: How to Choose for Urban Utility Projects
    Micro-tunnelling
    Trenchless Construction Methods Explained: How to Choose for Urban Utility Projects
    Trenchless Construction explained for urban utility projects: compare HDD, microtunneling, pipe jacking, and rehab methods to choose the right solution with less disruption and lower risk.
    Jun 10, 2026
  • Indonesia Port Project Highlights Rectangular Pipe Jacking
    Rectangular Pipe Jacking
    Indonesia Port Project Highlights Rectangular Pipe Jacking
    Rectangular Pipe Jacking takes center stage in Indonesia’s FHT port project, where four berths and a utility corridor highlight faster delivery, soft-soil adaptability, and new opportunities for contractors and suppliers.
    Jun 10, 2026
  • Rectangular Pipe Jacking
    PSA Caps Rectangular Pipe Jacking Units at 42 Tons per TEU
    PSA caps Rectangular Pipe Jacking units at 42 tons per TEU, reshaping oversized equipment shipping. Learn the new rule, delay risks, and smarter transport options now.
    Jun 09, 2026
  • PSA Tightens 42-Ton Limit on Wide TBM Shipments
    Rectangular Pipe Jacking
    PSA Tightens 42-Ton Limit on Wide TBM Shipments
    PSA tightens the 42-ton limit on wide TBM shipments, reshaping container planning, compliance costs, and delivery timelines. Learn what exporters, logistics teams, and buyers must do now.
    Jun 08, 2026
  • Trenchless Technology Cost Factors: What Drives Budget in Urban Pipeline Projects?
    Micro-tunnelling
    Trenchless Technology Cost Factors: What Drives Budget in Urban Pipeline Projects?
    Trenchless Technology cost in urban pipeline projects depends on soil, shafts, utilities, equipment, and traffic limits. See what really drives budget risk before you compare bids.
    Jun 08, 2026
  • China Opens Trade Barrier Probe, Green TBM Exports Eye Certification Window
    Slurry Pipe Jacking
    China Opens Trade Barrier Probe, Green TBM Exports Eye Certification Window
    China trade barrier probe puts green TBM exports in focus. Explore how certification, carbon-footprint proof, and compliance shifts could reshape market access and bidding.
    Jun 07, 2026
  • WTO Cuts 2026 Trade Growth to 1.9% as Strait Disruption Hits TBM Shipping
    Micro-tunnelling
    WTO Cuts 2026 Trade Growth to 1.9% as Strait Disruption Hits TBM Shipping
    WTO cuts 2026 trade growth to 1.9% as Strait disruption delays TBM shipping. Learn how rerouting, higher freight costs, and delivery guarantee demands impact exporters and project buyers.
    Jun 07, 2026
  • Kunming Event Signals Faster Export Clearance for Micro-tunnelling Equipment
    Micro-tunnelling
    Kunming Event Signals Faster Export Clearance for Micro-tunnelling Equipment
    Micro-tunnelling equipment exporters could gain faster export clearance after the Kunming corridor event, with Mohan port customs time expected to drop over 40% for Southeast Asia projects.
    Jun 05, 2026
  • Micro-tunnelling
    Food Safety Checks Raise Remote Ops Compliance Stakes
    Food Safety Checks now raise remote ops compliance risks for IoT cloud, industrial SaaS, and micro-tunnelling firms. See what MLPS 2.0, GDPR, and cross-border data rules mean next.
    Jun 04, 2026
  • <Previous
  • 1
  • ...
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez
  • Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Nov 06, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

