• Underground LHD Loaders

    
    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • Mining Dump Trucks

    
    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • Drilling Jumbos

    
    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • Pipe Jacking Machines

    
    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • Tunnel Boring Machines

    
    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • Intelligence Dimension

    
    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights


  • Underground LHD Loaders
  • Mining Dump Trucks
  • Drilling Jumbos
  • Pipe Jacking Machines
  • Tunnel Boring Machines
  • Intelligence Dimension


Home > News > Pipe Jacking Machines
  • ECRL Power Link Signals New Demand for Micro-tunnelling
    Micro-tunnelling
    ECRL Power Link Signals New Demand for Micro-tunnelling
    Micro-tunnelling demand is rising after Malaysia’s ECRL power link milestone. Discover how trenchless rail power delivery may reshape procurement, supplier screening, and Southeast Asia project opportunities.
    Jun 14, 2026
  • Phu Quoc Tram Win Highlights Micro-tunnelling Access
    Micro-tunnelling
    Phu Quoc Tram Win Highlights Micro-tunnelling Access
    Phu Quoc Tram win highlights micro-tunnelling access in Vietnam, with 65% underground works and VNCERT 2026-03 compliance shaping ASEAN municipal market entry. Learn what contractors and suppliers should watch now.
    Jun 13, 2026
  • ECRL Power-Up Lifts Slurry Pipe Jacking Demand
    Slurry Pipe Jacking
    ECRL Power-Up Lifts Slurry Pipe Jacking Demand
    Slurry Pipe Jacking demand is rising as the ECRL power-up of seven 11kV substations accelerates underground corridor, tunnel interface, and municipal pipeline works in Malaysia.
    Jun 13, 2026
  • How to Choose Trenchless Pipe Installation Equipment for Soil, Diameter, and Drive Length
    Micro-tunnelling
    How to Choose Trenchless Pipe Installation Equipment for Soil, Diameter, and Drive Length
    Trenchless Pipe Installation equipment selection made simple: learn how soil conditions, pipe diameter, and drive length impact performance, risk, and project success.
    Jun 12, 2026
  • Trenchless Pipe Installation vs Open-Cut: Cost, Surface Impact, and Best-Fit Conditions
    Slurry Pipe Jacking
    Trenchless Pipe Installation vs Open-Cut: Cost, Surface Impact, and Best-Fit Conditions
    Trenchless Pipe Installation vs open-cut: compare total cost, surface disruption, and best-fit conditions to choose the smarter, lower-risk solution for urban and industrial projects.
    Jun 12, 2026
  • Mozambique Tightens Import Rules for Slurry Pipe Jacking
    Slurry Pipe Jacking
    Mozambique Tightens Import Rules for Slurry Pipe Jacking
    Slurry Pipe Jacking imports to Mozambique now face stricter customs rules. Learn how certified slurry separation modules affect compliance, delivery, and project planning.
    Jun 12, 2026
  • Tunnel Surveying Equipment Guide: Key Accuracy Specs, Use Cases, and Selection Tips
    Micro-tunnelling
    Tunnel Surveying Equipment Guide: Key Accuracy Specs, Use Cases, and Selection Tips
    Tunnel Surveying Equipment guide covering key accuracy specs, real tunnel and mining use cases, and smart selection tips to reduce risk, improve alignment, and choose with confidence.
    Jun 11, 2026
  • KL–Karak Expansion Tightens Pipe Jacking Delivery
    Rectangular Pipe Jacking
    KL–Karak Expansion Tightens Pipe Jacking Delivery
    KL–Karak Expansion tightens rectangular pipe jacking delivery as 12 machines are needed and lead times stretch to Q2 2027. See what contractors, buyers, and suppliers must do now.
    Jun 11, 2026
  • EU Rule Takes Effect on AI Slurry Pressure Control
    Slurry Pipe Jacking
    EU Rule Takes Effect on AI Slurry Pressure Control
    EU Rule Takes Effect on AI Slurry Pressure Control: learn how EN 16895:2026 reshapes slurry pipe jacking compliance, customs clearance, procurement risk, and EU project delivery.
    Jun 11, 2026
  • <Previous
  • 1
  • ...
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • Next>

Product classification

  • 

    Underground LHD Loaders

    • Flameproof Loaders

    • Autonomous LHDs

    • Battery LHDs

  • 

    Mining Dump Trucks

    • Articulated Dump Trucks

    • Rigid Haul Trucks

    • EV/Hydrogen Mining Trucks

  • 

    Drilling Jumbos

    • Hydraulic Rock Drills

    • Bolting & Drilling

    • Computerized Jumbos

  • 

    Pipe Jacking Machines

    • Micro-tunnelling

    • Rectangular Pipe Jacking

    • Slurry Pipe Jacking

  • 

    Tunnel Boring Machines

    • Cutterheads & Disc Cutters

    • Slurry/EPB Shields

    • Hard Rock TBMs

  • 

    Intelligence Dimension

    • Latest Sector News

    • Evolutionary Trends

    • Commercial Insights

Trending in Tech

  • How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    How TBM Excavation Works in Rock and Soft Ground: A Practical Guide
    Nov 07, 2026
    Ms. Elena Rodriguez
  • Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Choosing a Zero-Emission Underground Equipment Supplier: What to Check
    Nov 06, 2026
    Ms. Elena Rodriguez
  • Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Construction Starts on Germany's Pfaffensteig Rail Tunnel, With Two TBMs Planned
    Nov 06, 2026
    Dr. Alistair Vaughn

Weekly Insights

Stay ahead with our curated technology reports delivered every Monday.

Subscribe Now

About Us

The Global Power Grid Dynamics (PGD) is a premier intelligence portal dedicated to UHV transmission, heavy power generation equipment, smart dispatching, and large-capacity energy storage systems.

About Us
Contact Us

Underground LHD Loaders

  • Flameproof Loaders

  • Autonomous LHDs

  • Battery LHDs

Mining Dump Trucks

  • Articulated Dump Trucks

  • Rigid Haul Trucks

  • EV/Hydrogen Mining Trucks

Drilling Jumbos

  • Hydraulic Rock Drills

  • Bolting & Drilling

  • Computerized Jumbos

Pipe Jacking Machines

  • Micro-tunnelling

  • Rectangular Pipe Jacking

  • Slurry Pipe Jacking

Tunnel Boring Machines

  • Cutterheads & Disc Cutters

  • Slurry/EPB Shields

  • Hard Rock TBMs

Intelligence Dimension

  • Latest Sector News

  • Evolutionary Trends

  • Commercial Insights

Copyright © Global Underground Tunnelling & Mining Dynamics (UTMD)

Resources

Site Index

